wines

party facilities

favors

events

order form

directions

Email Newsletter icon, E-mail Newsletter icon, Email List icon, E-mail List icon Sign up for our Email Newsletter
For Email Marketing you can trust

 

 


2012 Construction

The white area between the gray crushed stone and the remaining section of the brick patio is the foundation for the new back wall of the Barn. The large opening in the closest concrete wall is for our pallet lift that will be able to move full pallets from one level of the Winery to any other. There was a running design change that resulted in a chunk of that opening getting poured then cut out with a saw. If anyone wants the piece they cut out, it's a slab 27" wide, 152 3/4" long and about 11 1/2" thick. Estimated to weigh 4,500 Lbs. it's priced to move at FREE to the first taker.


Here's that opening from the other side, with the steel forms used to cast the walls in the foreground. Notice the door from the Barn that used to lead onto the deck. A month or so from now, the first floor will be there.e.

Three months ago, the wooden deck would have been centered in the frame. This is looking north from in back of the barn in the brick patio area.


This view shows a view across the main room of the Winery looking Northeast through the lift opening.

Another view of the cellar floor. There's room for a basketball game.


This is from inside the cellar. The floor is very similar to the floor in our current Winery.

To get from the cellar to the upper levels there will be a zig-zag staircase built into a short silo.
 

258 Durham Road (Rt. 413) * Newtown, PA 18940
215-860-5899 * rosebank2@aol.com

Untitled Document